Available
Industrial Lots

Phase two now on sale

World Class Infrastructure


  • Phase I 100% Sold Out
  • Phase II Delivery (Q3 2019)
  • 126 hectares (312 acres)
  • Lots from 10,000 m
  • Project Optimized to land topography, minimum infill costs
  • CCTV 24/7
  • Land for sale / Build to suit / Multitenant facilities
  • Electrical substation 30 MVA’s and 30 MVA’s available for expansion.
  • Water treatment plant
  • 2 water wells with capacity to support any industrial process
  • Natural Gas Feasibility Pipeline 6.4km from the park (Under construction)
  • High-pressure Fire Protection System FM Approved and UL Listed
Download Master Plan

San Miguel
de Allende Facts


  • Gross Domestic Product SMA: US$ 461 Million
    1.5% State´s GDP Primary: 15.5%
    Industry: 9.3% Services 75.2%
  • Total Population: 171,857
  • Foreign Direct Investment SMA: US$ 200 Million
  • Located in the heartland of Mexico
  • 9 hour drive to US border
  • In 2018 was awarded “Best City in the World” by Travel + Leisure
  • Competitive and abundant skilled labor available

Points Of Interest

Automotive Assembly Plants

Contact

Carretera Federal 111 Queretaro-San Miguel de Allende Km 21, cruce carretera Corral de Piedras, San Miguel de Allende, Gto., Mexico.


Zonia Torres



Please enter your first and last name separated by a space (e.g. Jane Miller)